Fall 2013 Exam Schedule
|
Exam 1 |
Monday |
Sept. 30 |
|
Exam 2 |
Monday |
Nov. 4 |
|
Exam 3 |
M – F In Lab Period |
Dec. 2 - 6 see syllabus page |
|
Final |
Scheduled by registrar |
|
Fall 2013 Due Dates *** Late Reports Lose 5% Per Day
|
|
|
Lab Section |
||||
|
No. |
Exercise |
Mon |
Tue |
Wed |
Thu |
Fri |
|
1 |
Tully Valley Geology [100] |
9/2
|
9/3
|
9/4 |
9/5 |
9/6 |
|
2 |
Navigating Soil Cyberspace [50] |
9/9
|
9/10 |
9/11 |
9/12 |
9/13 |
|
3 |
Morphology of a Lacustrine Catena [200] |
Draft
9/16 Final
9/30 |
Draft
9/17 Final
10/1 |
Draft
9/18 Final
10/2 |
Draft
9/19 Final
10/3 |
Draft
9/20 Final 10/4 |
|
4 |
Morphology of a Glacial Till Catena [400] |
10/14 |
10/15 |
10/16 |
10/17 |
10/18 |
|
5 |
Soil Physical Properties [189] |
10/7 |
10/8 |
10/9 |
10/10 |
10/11 |
|
6 |
Erosion and BMPs [50] |
NA |
NA |
NA |
NA |
NA |
|
7 |
Soil Water [110] |
10/21 |
10/22 |
10/23 |
10/24 |
10/25 |
|
8 |
Organic Soil [50] |
NA |
NA |
NA |
NA |
NA |
|
9 |
Soil CEC [100] |
11/11 |
11/12 |
11/13 |
11/14 |
11/15 |
|
10 |
Soil pH [105] |
12/2 |
12/2 |
12/2 |
12/2 |
12/2 |
|
11 |
Soil fertility [100] |
12/2 |
12/3 |
12/4 |
12/5 |
12/6 |